plus Created with Sketch. ! arrow-down arrow-left arrow-right arrow-up Asset 9Asset 7Asset 2 Group 2 Created with Sketch. Rectangle 11 Copy 4 Created with Sketch. Asset 6 close Asset 5 Icon/news/default Asset 20 arrow Created with Sketch. edit Group Created with Sketch. Icon/Learning/Active Icon/Learning/Inactive Shape Asset 10 instagram linkedin Asset 8 Icon/news/default menu send-2 Created with Sketch. Asset 3 pin Asset 14 search share Asset 15Asset 16Asset 19 twitter Asset 11
The Clean Energy Regulator is expected to announce a new accreditation provider in February 2024. To prepare for the transition we are making changes to applications and fees. Find out more

Thank you for your interest in getting your Clean Energy Council accreditation.

Please ensure you have all required documents before starting your application. You will be asked to make your application payment of $165 + GST as part of your application process. Your application won't be processed until payment has been received.

Please note: If you already hold accreditation with the Clean Energy Council and want to add an additional accreditation, you should not complete this form. Please apply via the Installer portal.

Applicants should be aware of the following installation requirements for SPS:

  • There must be no grid connection to any part of the electrical installation.
  • The PV array must be at least 1kW or for systems utilising other renewable energy sources i.e. wind/storage 1kWh/day.
  • Must contain a battery energy storage system (BESS) with a capacity of at least 1.5kWh useable at the recommended C rating.
  • The system must include at least two variable AC loads.
  • A load analysis and system design must be provided including surge factor, power factor, days of autonomy, depth of discharge, generator run time, etc as per the requirements of AS/NZS 4509.2. Examples of unsuitable systems include: telecommunications system, battery back-up (UPS).
  • The installation must be on a fixed structure with a fixed address. Examples of unsuitable structures include: mobile structure, boat, caravan, trailer etc.
  • The installation must not have been previously submitted to the CEC for accreditation purposes.
YOUR DETAILS





COMPANY ADDRESS







YOUR ADDRESS




YOUR APPLICATION


TRAINING



OTHER REQUIREMENTS





YOUR ID

Your ID photo should be no smaller than 45mm x 35mm and should be provided as a .jpeg file. Your photo should have a plain, light colored background and show you looking directly at the camera with a neutral expression.
ABOUT YOU
The Clean Energy Council collects industry data to provide a snapshot of the professional and social identities of the clean energy workforce.




DECLARATIONS



Amount:   $ 165.00
GST:          $  16.50
Total:        $  181.50
Accepted Payment Options