plus Created with Sketch. ! arrow-down arrow-left arrow-right arrow-up Asset 9Asset 7Asset 2 Group 2 Created with Sketch. Rectangle 11 Copy 4 Created with Sketch. Asset 6 close Asset 5 Icon/news/default Asset 20 arrow Created with Sketch. edit Group Created with Sketch. Icon/Learning/Active Icon/Learning/Inactive Shape Asset 10 instagram linkedin Asset 8 Icon/news/default menu send-2 Created with Sketch. Asset 3 pin Asset 14 search share Asset 15Asset 16Asset 19 twitter Asset 11

CEC feedback on Draft Queensland Electricity and Connection manual

Submission

Submission

Posted on 21 July, 2023

Download

The CEC recognises the importance of a robust and resilient network. We have supported work towards enabling dynamic operating envelopes for Consumer Energy Resource (CER), with particular focus on dynamic export limits that unlock generation capacity and reward consumers who own CER for making their energy more flexible and supporting the wider system. The CEC welcomes the approach (if not the mechanism) Energy Queensland and their subsidiaries (EQ) have taken to this end, resulting in larger potential photovoltaic (PV) solar system sizes for consumers.