plus Created with Sketch. ! arrow-down arrow-left arrow-right arrow-up Asset 9Asset 7Asset 2 Group 2 Created with Sketch. Rectangle 11 Copy 4 Created with Sketch. Asset 6 close Asset 5 Icon/news/default Asset 20 arrow Created with Sketch. edit Group Created with Sketch. Icon/Learning/Active Icon/Learning/Inactive Shape Asset 10 instagram linkedin Asset 8 Icon/news/default menu send-2 Created with Sketch. Asset 3 pin Asset 14 search share Asset 15Asset 16Asset 19 twitter Asset 11

Submission on the Essential Services Commission’s Land Access Code of Practice draft determination

Submission

Submission

Posted on 4 October, 2023

Download

Victoria has set targets of reaching 65% renewable energy by 2030 and 95% by 2035. These targets are commendable and represent an essential element of the state’s response to the climate crisis. Because much of the state’s best wind and solar resources do not overlap with the previously dominant source of electricity (ie. Latrobe Valley brown coal generators), Victoria’s transition to renewable energy requires the timely construction of new transmission lines to enable wind and solar farms in other parts of the state to connect to the grid. Delays to transmission means delays to wind/solar projects, which keeps Victoria’s greenhouse gas emissions high, contributing to greater climate impacts.