plus Created with Sketch. ! arrow-down arrow-left arrow-right arrow-up Asset 9Asset 7Asset 2 Group 2 Created with Sketch. Rectangle 11 Copy 4 Created with Sketch. Asset 6 close Asset 5 Icon/news/default Asset 20 arrow Created with Sketch. edit Group Created with Sketch. Icon/Learning/Active Icon/Learning/Inactive Shape Asset 10 instagram linkedin Asset 8 Icon/news/default menu send-2 Created with Sketch. Asset 3 pin Asset 14 search share Asset 15Asset 16Asset 19 twitter Asset 11

Submission on Vicgrid Options Assessment Method to Offshore Wind Transmission in Gippsland and Portland

Submission

Submission

Posted on 4 October, 2023

Download

Victoria’s transition to renewable energy requires the timely construction of new transmission lines to enable upcoming offshore wind farms to connect to the grid. Delays to transmission means delays to these projects, which keeps Victoria’s greenhouse gas emissions high, contributing to greater climate impacts.

Transmission projects are thus being developed to enable a significant public benefit – the reduction of greenhouse gas emissions – that is in the interests of all Victorian consumers.

Our feedback on VicGrid’s Options Assessment Method to Offshore Wind Transmission in Gippsland and Portland falls into three categories outlined in this post.