plus Created with Sketch. ! arrow-down arrow-left arrow-right arrow-up Asset 9Asset 7Asset 2 Group 2 Created with Sketch. Rectangle 11 Copy 4 Created with Sketch. Asset 6 close Asset 5Asset 20 arrow Created with Sketch. Group Created with Sketch. Shape Asset 10 instagram linkedin Asset 8 menu minus Created with Sketch. minus Created with Sketch. send-2 Created with Sketch. Asset 3 pin Asset 14 plus Created with Sketch. plus Created with Sketch. search share Asset 15Asset 16Asset 19 twitter Asset 11

Resources hub

Categories
Clear

Response to the draft determination on the transparency of new projects rule change proposal

Our submission to the Australian Energy Market Commission

Download

Submission

12 Sep 19

Response to the draft determination on the wholesale demand response mechanism rule change

Our submission to the Australian Energy Market Commission

Download

Submission

12 Sep 19

Australia's clean energy investment outlook

This outlook provides an insight into the current state of clean energy investment in Australia, finding that after a record breaking two years of investment, the pace of projects reaching financial close has slowed dramatically over the past two quarters.

view Download

Report

10 Sep 19

Response to improving transparency and accessibility of grid connection requirements

Our submission to Energy Networks Australia

Download

Submission

6 Sep 19

The Distributed Energy Resources Revolution: A Roadmap for Australia's Enormous Rooftop Solar and Battery Potential

This report addresses the challenges that distribution network service providers, regulators, governments and policy makers will face as we make the transition to a distributed energy resources future.

view Download

Report

28 Aug 19

Response to the consultation paper on the transmission loss factors rule change proposal

Our supplementary submission to the Australian Energy Market Commission

Download

Submission

15 Aug 19

Response to the NSW Empowering Homes market sounding paper

Our submission to the NSW Department of Planning

Download

Submission

9 Aug 19

Response to the draft report on the review of the regulatory frameworks for stand-alone power systems - priority 2

Our submission to the Australian Energy Market Commission

Download

Submission

2 Aug 19