plus Created with Sketch. ! arrow-down arrow-left arrow-right arrow-up Asset 9Asset 7Asset 2 Group 2 Created with Sketch. Rectangle 11 Copy 4 Created with Sketch. Asset 6 close Asset 5 Icon/news/default Asset 20 arrow Created with Sketch. edit Group Created with Sketch. Icon/Learning/Active Icon/Learning/Inactive Shape Asset 10 instagram linkedin Asset 8 Icon/news/default menu send-2 Created with Sketch. Asset 3 pin Asset 14 search share Asset 15Asset 16Asset 19 twitter Asset 11

Resources hub

Categories
Clear

Submission on draft South Australian Hydrogen and Renewable Energy Regulations

The South Australian Department of Mining and Energy sought views on draft regulations for the Hydrogen and Renewable Energy Act.

view Download

Submission

1 May

Submission on federal environmental law reform

The federal Department of Climate Change, Energy, Environment and Water sought submissions on draft policy and provisions on "nature positive" federal environmental law reform.

view Download

Submission

1 May

Submission on Energy and Electricity Sector Plan

The Australian government sought views on aspects of the energy transformation to achieve the 2030 emissions reduction target and net zero by 2050 while ensuring a reliable, secure and affordable energy supply.

view Download

Submission

1 May

Service Target Incentive Performance Scheme submission

We welcome the opportunity to comment on Issues Paper related to the Service Transmission Target Performance Incentive Scheme (STPIS). We agree that the market impact component (MIC) and network capability component (NCC) of the STPIS need to be reviewed. We also agree with AER’s analysis that indicates the MIC is not working as intended and the NCC is being under-utilised.

view Download

Submission

20 Apr

Transmission Ring Fencing Submission

We welcome the opportunity to comment on the AEMC’s draft determination and draft rule for Expanding the transmission ring-fencing framework rule change.

view Download

Submission

19 Apr

Submission on Unlocking CER Benefits Through Flexible Trading, Draft Determination

The Draft 2024 Integrated System Plan identifies that flexible energy will be a big part of the new, clean and affordable energy future. Specifically, AEMO predict the capacity of coordinated behind-the-meter storage will increase to 37 GW in 2049-50, of which they anticipate 80% will be orchestrated. To achieve this goal, we need to implement policy that encourages and empowers consumers to not only adopt storage, but to trust that market participants will provide simple and valuable orchestration services.

view Download

Submission

12 Apr

Victorian Energy Jobs Plan submission

Workforce planning is essential to mitigating the existing challenges of worker shortages that will only be exacerbated through the transition. Clean energy projects are currently experiencing skill shortages in critical occupations including electricians and construction workers. We welcome the opportunity to make a submission in response to the Victoria Energy Jobs Plan Consultation Paper (The Paper).

view Download

Submission

8 Apr

Renewable Projects Quarterly Report (Q4 2023)

2023 was a record-breaking year for storage in terms of MWs added (3,949), MWhs added (9,095), and capital investment ($4.9B). It was also a record-breaking quarter for storage in these same metrics, breaking all the records which had been set in Q2. However, 2023 was the lowest level of large-scale renewable energy generation capacity reaching financial commitment at 1.3GW.

view Download

Report